IT Procurement Services

We handle IT hardware and software procurement, licensing, prep and nationwide shipping, so equipment arrives ready to install.

Our IT procurement services cover hardware, software and licensing, with preparation in our Ridgefield warehouse and shipping to one site or many.

Scroll down

What We Handle

Procurement, preparation and delivery.

Tell us what you need and where it’s going, then we’ll take it from there.

Business IT hardware including laptops, monitors, networking, security and peripherals

Hardware and software

  • Laptops, desktops, monitors, docks and accessories
  • Network, wireless, security, servers, storage and power
  • POS, printers, phones and workplace peripherals
  • Software and licensing
IT equipment staging, asset tagging and kitting for deployment

Staging, tagging and kitting

  • Receiving, inspection and serial capture
  • Imaging, configuration and asset tags
  • User and site kits, boxed and labeled
IT hardware inventory, storage and multi-site delivery logistics

Inventory and delivery

  • Storage until your install date
  • Shipping to one site or to many
  • Asset and shipment records handed to your team

How It Works

How our IT procurement services actually work.

01

We confirm the requirement

Quantity, configuration, standards, licensing, warranty, destinations and dates. With those details up front, we can quote the right equipment and scope. If something’s missing, we’ll ask instead of guessing.

02

We source and price it

We source the hardware and quote the manufacturer’s lead time separately from our staging time, so your install date reflects both.

03

We prepare it

We handle receiving, inspection, asset tags, imaging, accessories and kits, to whatever depth you ask for, before anything leaves the building.

04

We ship and hand off

Then equipment ships by user, site or wave, with the records your team needs.

Two Ways to Buy

One procurement project, or an ongoing program.

One project

A refresh, a new site or an infrastructure purchase

You know the quantity and the install date. We handle the hardware procurement, prepare the equipment and time the shipment around that schedule.

Ongoing program

Onboarding, replacements and refresh waves

For repeat hardware procurement, we work from the model, configuration or kit list your team has approved, and release equipment when you ask for it.

Before It Ships

What we can do before it ships.

Before anything ships, we can receive and inspect it, capture serials, apply asset tags, image and configure devices, pair accessories and build kits by user or site. If a build needs a specific image, label format or accessory setup, send those requirements up front. Also include the image, credentials and access the configuration depends on.

Ridgefield, Washington

Where the work happens.

Receiving, staging, kitting, storage and shipping all run out of our own warehouse. That’s why we can hold equipment until your install date instead of dropping it on your team early.

We can also split shipments by site, wave or user and hand your team the asset and shipment records.

65,000 sq. ft. Receiving, staging, kitting, storage and shipping.
1,000 units in three nights Per call center, across 22 sites, working overnight.
Aerial view of HTG's 65,000 square foot Ridgefield procurement, staging and kitting facility, with a Washington state map marking HTG headquarters at 601 S 74th Place, Ridgefield

Connected Services

Where our IT procurement services connect next.

Technology procurement is usually one part of a larger project. When the equipment is ready to ship, the next step depends on the job.

A multi-site installation usually moves into Technology Deployment, and a single onsite visit goes to Field Services, while server, storage and rack work inside a data center moves to Data Center Infrastructure. If the design isn’t settled yet, Integration & Engineering comes first, before anyone picks equipment. When the equipment you’re replacing has to be tracked, wiped or retired, Lifecycle Management and ITAD take it from there.

Common Questions

Common questions about IT procurement services.

What do information technology procurement services include?

Information technology procurement is buying the hardware, software and licensing a business runs on, then getting it ready to use. Our hardware procurement covers laptops, desktops, monitors, network and security equipment, servers, storage, POS and peripherals. For software and licensing, we can buy whatever is available through the distributors we work with.

Can you stage, image and tag equipment before it ships?

Yes. We handle inspection, serial capture, asset tags, imaging, configuration, accessories and user or site kits before the equipment ships.

Do you work with one manufacturer or several?

Several. Our IT sourcing services start from what you actually need rather than a single brand, and if you already have an approved standard, we buy to it.

What affects price and delivery timing?

Quantity, configuration, manufacturer availability, licensing terms, how much staging you want, how many destinations and the freight method.

Can HTG standardize hardware across multiple locations?

Yes. We’re a Gold Partner with Dell Technologies and Lenovo, so we can source and configure the same build for every site, whether your standard is a Dell Pro business laptop or a Lenovo ThinkPad. New hires and refresh waves get consistent hardware, whether you already have an approved standard or want help settling on one. The full list of manufacturers we work with is on our strategic partners page.

Get Started

Start a procurement request.

Send the quantity, the requirements, the destinations and your target dates. We’ll come back with what it costs, when it can land and what we can have ready before it ships.

This field is for validation purposes and should be left unchanged.
Max. file size: 1 GB.